The objective of any maintenance program in industries is to take care of the Equipment's Total Life Cycle at the most reasonable cost with compliance to quality, safety, and the environment.

To perform this we need the following;

Ganze Beschreibung lesenWeniger anzeigen
  • Upgrade the skills and knowledge of our maintenance people
  • Sustain equipment reliability by doing the correct maintenance
  • Improve design weaknesses in the equipment
  • Reduced the cost of doing maintenance

This means that before we can even sustain and preserve our equipment and assets, we need to provide our maintenance people with the knowledge to develop their skills to do their job correctly, but it does not stop from here. Sustaining and preserving the equipment is merely the beginning. Maintenance must also understand their equipment, especially on those parts, spares, and items with inherent design weaknesses, and improve them.

Doing this will definitely reduce the cost of doing maintenance. This book is written based on the Author's personal experience on how to make it possible to extend the Total Life Cycle of the equipment so that we can operate and maintain them at the least amount to own the asset. The study of the life cycle is simply the sum of both the Initial and the Running Cost of the equipment.

While the initial cost is easy to see as it is always given, the running cost is not but it can still be projected. This book also explains how to integrate the pillar of TPM IFCA or Initial Flow Control Activities to shorten the vertical start-up time of the equipment. Some of the highlights of this book include the following;

  • Why Life Cycle Costing is Important for Industries
  • No Equipment is Perfect by Design – Why Equipment Can No Longer be Used?
  • The Six Conditions for Equipment's Initial Flow Control Activities
  • Why Cheap Is Expensive
  • Why Do Equipment fail and What Can be Done About It?
  • Human Errors Explained
  • When Maintenance Errors Cost Lives
  • Maintenance and Non-Maintenance Induced Errors
  • Reducing Human Errors in Maintenance
  • Strategies to Reduce Equipment's Maintenance Costs
  • A Deeper Meaning of Reliability
  • Why Reliability is Everybody's Responsibility
  • Difference Between the East and the West Approach to Improvements
  • Industries Problems Can Go Beyond Equipment Losses
  • Detailed Steps in Monitoring Equipment Life Cycle
  • Cost Cutting the Wrong Way to Save on Maintenance Costs
  • The Challenge with Maintenance
  • And More …

Details

Erscheinungstermin
August 2022
Kategorie
Fremdsprachige Bücher
Einband
Gebunden
Seiten
340
Sprache
Englisch
Verlag
Rolando Santiago Angeles
Reihe
World Class Maintenance Management
Format
28,6 × 22,1 cm
Dicke
2,3 cm
Gewicht
1.033 g
EAN / ISBN-13
9798885260084
Maßstabsgetreu: Deckel und Buchrücken neben einer Hand (18 cm).

Über Rolly Angeles

Rolly is a seasoned international maintenance and reliability consultant with over 30 years of solid experience in the field.

Mehr über Rolly AngelesWeniger anzeigen

He has been invited to different countries and has conducted reliability and maintenance training in United Arab Emirates, Qatar, India, Malaysia, Indonesia, Brunei, Thailand, Nigeria, Bangladesh, South Africa, China, and Botswana. His maintenance training portfolio includes maintenance and reliability courses on TPM, Lubrication, Tribology, Condition-Based Maintenance, RCM, RCFA, TPM Planned Maintenance, Autonomous Maintenance 7 Steps, World Class Maintenance Management, The 12 Disciplines, Oil Contamination Control, Maintenance Indices, and KPI's, Maintenance and Reliability Management Strategies and much more. Rolly previously worked with Amkor Technology Philippines as a TPM Senior Engineer, an industry engaged in manufacturing Integrated Circuit products and spearheaded their Planned Maintenance organization, composed of maintenance managers and engineers. He was also responsible for dramatically reducing unplanned breakdowns in their TPM Journey and RCM implementation on their Facilities AHU units and substation equipment.

Rolly is currently working as an independent reliability and maintenance consultant. Rolly is a graduate of Mechanical Engineering from Mapua Institute of Technology in the Philippines, batch 1985, and passed the licensure board examination the following year in 1986. With 30 years of solid experience, he had worked in various industries from shipping, woodworking, foundry, cast-iron machining, assembly lines, semiconductor manufacturing, and the mining industry. Here, he gained hands-on experience and understanding of TPM and RCM, respectively, a strategy from both the west and the east. His last corporate employment was in 2002, where he worked as a technical training specialist at Lepanto Consolidated Mining Industry. In 2005, Rolly retired early from the industry and decided to establish his own consulting business, RSA Reliability and Maintenance Consultancy Firm, where he dedicates his time and passion for working as an independent reliability and maintenance consultant. He provides in-house training, consultation, and facilitation to different maintenance and reliability best practices.

Versand und Rückgabe

Standardversand: 1 bis 3 Werktage, 3,99 €, kostenlos ab 35 €

Liefergebiet: Deutschland

Rücksendung: 14 Tage Widerrufsrecht. Bei einem Widerruf tragen Sie die Kosten der Rücksendung. Bei einer Falschlieferung oder einem Fehler von uns erstatten wir Ihnen das Rückporto. Den Widerruf erklären Sie über den Knopf „Vertrag widerrufen“ im Fuß der Seite.

Hersteller und ProduktsicherheitRolando Santiago Angeles
Rolando Santiago Angeles

Verantwortliche Person in der EU

Libri GmbH
Europaallee 1
36244 Bad Hersfeld
Deutschland
gpsr@libri.de

Mehr von Rolly Angeles

Mehr aus der Reihe World Class Maintenance Management

Ähnliche Titel

Bewertungen

Zu diesem Titel gibt es noch keine Bewertung. Bewerten kann, wer ihn bei uns gekauft hat.

So prüfen wir Bewertungen
Eine Bewertung kann bei uns nur abgeben, wer den Titel über sein Kundenkonto bei uns gekauft hat. Jede Bewertung ist fest mit der zugehörigen Bestellung verknüpft; anders kommt sie technisch gar nicht zustande. Deshalb trägt jede angezeigte Bewertung den Hinweis „Verifizierter Kauf". Wir zeigen positive wie negative Bewertungen und löschen nur bei Rechtsverstößen. Für Bewertungen gibt es keine Gegenleistung.
79,10 €Voraussichtlich 7. bis 9. Dez.

Inhalte ab 18

Cover von Titeln für Erwachsene, etwa erotische Romane, Manga oder Comics, bleiben unscharf, bis Sie bestätigen. Die Bestätigung gilt für alle Seiten und Tabs, bis Sie den Browser schließen.

Zurück zum Katalog