Buch-OWLOnline-Buchhandel

THE CRITICAL PATH

A Business Novel About Schedules, Claims and Telling the Truth

von Hassan Khames Eliwa

Einband
Kartoniert
Seiten
192
Sprache
Englisch
Erschienen
Oktober 2026
Verlag
Eliwa Project Controls Limited

Buchbeschreibung

Six months late.

Fourteen days reported. Eighty-four days to tell the truth. Nadia Farouk is a senior planner who can make any schedule behave. When her company sends her to Dubai to "tidy the programme" on a troubled 600-bed hospital, she expects a few weeks of formatting.

Ganze Beschreibung lesenWeniger anzeigen

Instead she finds forty-seven date constraints hiding a six-month delay, a project director determined to keep his number, a client moving toward termination, and a contract clock counting down to the day her company's right to claim expires.

To save the project, Nadia must answer three questions that an old forensic delay expert writes on a napkin: Whose delay is it? When did you know? Can you prove it? And she must decide what to do when some of the answers belong to her own company.

A business novel and a complete project controls course in one book. Written by a practitioner with more than twenty years in planning, scheduling, delay analysis and construction claims, The Critical Path teaches the way the job is really learned: under pressure, on a real project, with real people. Along the way you will learn: The critical path method (CPM), total float, free float and the longest path

Why mandatory constraints hide delay instead of removing it How to read a schedule health check, including the DCMA 14-point assessment

Baselines, progress measurement, earned value management (EVM) and earned schedule

Windows analysis, time impact analysis (TIA) and concurrent delay

Notices, time bars and extension of time (EOT) claims under an international standard contract (FIDIC 2017) Resource levelling, recovery planning, and testing and commissioning How to write a one-page report that a board will actually read

Every chapter ends with a page from the mentor's notebook, a short summary of what the chapter teaches. The book closes with a 47-term glossary, a lessons-by-chapter index and three ready-to-use tools: a one-page summary template, an Engineer's programme-review checklist and a list of lessons learned.

For planners and schedulers, project managers, construction managers, engineers, quantity surveyors, contract and commercial managers, and students of construction and project management. And for anyone who has ever been asked to hold the dates.

Details

Erscheinungstermin
Oktober 2026
Kategorie
Fremdsprachige Bücher
Einband
Kartoniert
Seiten
192
Sprache
Englisch
Verlag
Eliwa Project Controls Limited
Format
22,9 × 15,2 cm
Dicke
1,2 cm
Gewicht
321 g
EAN / ISBN-13
9781997355267
Maßstabsgetreu: Deckel und Buchrücken neben einer Hand (18 cm).

Über Hassan Khames Eliwa

Dr. Hassan Khames Eliwa is a Project Controls and Planning professional with more than 17 years of experience across infrastructure, building and engineering projects in New Zealand and internationally.

Mehr über Hassan Khames EliwaWeniger anzeigen

He holds a PhD in Construction Management and has published multiple academic and industry papers in project management, project controls and construction technology. Throughout his career, Dr. Eliwa has specialized in planning, scheduling, delay analysis, project controls, earned value management and executive reporting using industry-leading platforms such as Primavera P6, Microsoft Project and Synchro 4D. He is the founder of PMMilestone.org, a knowledge-sharing platform dedicated to practical project controls education, and Director of Eliwa Project Controls Limited, New Zealand. His mission is simple: To make professional project controls knowledge accessible, practical and immediately useful for project teams worldwide.

Versand und Rückgabe

Standardversand: 1 bis 3 Werktage, 3,99 €, kostenlos ab 35 €

Liefergebiet: Deutschland

Rücksendung: 14 Tage Widerrufsrecht. Bei einem Widerruf tragen Sie die Kosten der Rücksendung. Bei einer Falschlieferung oder einem Fehler von uns erstatten wir Ihnen das Rückporto. Den Widerruf erklären Sie über den Knopf „Vertrag widerrufen“ im Fuß der Seite.

Hersteller und ProduktsicherheitEliwa Project Controls Limited
Eliwa Project Controls Limited

Verantwortliche Person in der EU

Libri GmbH
Europaallee 1
36244 Bad Hersfeld
Deutschland
gpsr@libri.de

Mehr von Hassan Khames Eliwa

Ähnliche Titel

Bewertungen

Zu diesem Titel gibt es noch keine Bewertung. Bewerten kann, wer ihn bei uns gekauft hat.

So prüfen wir Bewertungen
Eine Bewertung kann bei uns nur abgeben, wer den Titel über sein Kundenkonto bei uns gekauft hat. Jede Bewertung ist fest mit der zugehörigen Bestellung verknüpft; anders kommt sie technisch gar nicht zustande. Deshalb trägt jede angezeigte Bewertung den Hinweis „Verifizierter Kauf". Wir zeigen positive wie negative Bewertungen und löschen nur bei Rechtsverstößen. Für Bewertungen gibt es keine Gegenleistung.
22,50 €Voraussichtlich 1. bis 3. Dez.

Inhalte ab 18

Cover von Titeln für Erwachsene, etwa erotische Romane, Manga oder Comics, bleiben unscharf, bis Sie bestätigen. Die Bestätigung gilt für alle Seiten und Tabs, bis Sie den Browser schließen.

Zurück zum Katalog